Separately sold parts
F - 4
2. System Configuration
ONJ pipe
45 ‹ elbow
90 ‹ elbow
ONJ pipe
Straight pipe
Slide pipe
Split halves
Exhaust gas top
Orientation of opening
Upward slope
(3/100 or greater)
Adaptor for exhaust
gas extension
500mm
or less
Support legs
With no thermal insulation
With thermal insulation
30 or more
Not contacting
Exhaust gas pipe
Thermal insulation
thickness 20 or more
N
ot con
tactin
g
H
o
rizon
tal on
e dir
ecti
on
al outlet
300 or more
300 or more
600
or more
150 or more
150
or more
Down
●
Method of securing the exhaust gas pipe
1) For securing the exhaust gas pipe, use the installation fittings (legs, split halves) and fit on site. Using
the bolts/screws of the unit top plate secure the pipe. Refer to Figure 7 for an example.
2) Secure the exhaust gas pipe extending from the main body of the unit to the external wall or other
suitable location, using installation fittings every 1.5-2.0m.
3) The limiting distance from the final securing location to the end of the exhaust gas extension pipe shall
be 500mm or less. Refer to Figure 7.
Fig. 7
●
Separation distance of the exhaust gas pipe
The separation distance (mm) of the exhaust gas pipe from “building parts with finishes made from flammable
materials, non-flammable materials, or quasi-flammable materials” shall be as shown in Figure 8.
●
Separation distance of exhaust gas top
The separation distance (mm) of the exhaust gas pipe opening from “building parts with finishes made from
flammable materials, non-flammable materials, or quasi-flammable materials” shall be as shown in Figure 9.
Figure 8
(
Space part
)
<
Reference
>
The dimensions within the (
)are the distances for the case where a heat-proof board is installed,
and “building parts are effectively finished with non-flammable materials.
Fig. 9(Separation distance around the exhaust gas top)
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...