Design
D - 16
Concrete foundation installation Cat
walk
installation
U
H
: Height of outdoor unit (m)
Blow out duct height(m)
Hu:
Ht:
H
Upstand height(m)
H u+H
t
(m)
Ht
U
H
H
U
Ht
U
H
Hu
Blow out
duct
*Note
Blow out
duct
*Note
:
START
Decide actual installation
capacity (HP)
Increase the upstand height
Fit a blow out duct
Modify the installation foundation
the cat walk
Change no. units/row or La
Provisional installation
Prov. Fix av. distance between units
Calculate Lu distance between rows
Calc. row length L
N
,
installation ext, dim.L
M
Is the air flow from the
surroundings sufficient
Correct cooling capability
END
Increase the opening in the walls
Decrease the height of the wall
Increase the distance from the wall
to the unit
No
Yes
Yes
No
Refer to
-1
Increase distance from wall
to
outdoor unit
5
Refer to
-1
5
Refer to
-1
5
Refer to
-1
8
to
■
Outdoor unit installation condition
4
Combined installation flow chart
5. Criteria for positioning the outdoor unit
Note)
When a blow out duct is used, in order that the exhaust gas from the engine is not sucked into the heat exchanger, extend
the exhaust pipe to the same height as the blow out duct, and other measures.
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...