Design
D - 39
Bolt span
Short direction(
l
1
)
l
1
=
㩷 㩷
1,000 mm
㩷
………..70, 90 type
䋺
1,000
120, 150, 190 type
䋺
1,000
Long direction(
l
2
)
l
2
=
㩷 㩷
1,060 mm
㩷
………..70, 90 type
䋺
1,060
120, 150, 190 type
䋺
1,060
Actual strength of the foundation bolts
Short term allowable tensile stress(f
t
)
f
t
=
㩷
176
㩷 㩷
N/mm
2
…
㩷
for SS400 f
t
:176
Short term allowable shear stress (f
s
)
f
s
=
㩷
99
㩷 㩷
N/mm
2
…
㩷
for SS400 f
s6
:132×0.75
Pull out load on one bolt
Short direction(R
b1
)
R
b1
=
㩷 㩷
=
㩷
1,614 N
Long direction(R
b2
)
R
b2
=
㩷 㩷
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
=
㩷
1,473
㩷
N
Foundation bolt shear stress(
)
=
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
=
㩷
15.6
㩷 㩷
N/mm
2
㩷
Foundation bolt tensile stress
Shor t direction(
1
)
1
=
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
=
㩷
14.3
㩷 㩷
N/mm
2
Long direction(
2
)
2
=
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
=
㩷
13.0
㩷
N/mm
2
Allowable tensile stress in a bolt subject to simultaneous tensile and shear stress(f
ts
)
f
ts
=1.4 f
t
-1.6
=
㩷
221.4
㩷
N/mm
2
Judgment
Tensile load
Short direction
䋺
if R
b1
<T
a
OK
R
b1
=
㩷
1,614
㩷
<
㩷
T
a
= 11,760
Long direction
䋺
if R
b2
<T
a
OK
R
b2
=
㩷
1,473
㩷
<
㩷
T
a
= 11,760
Shear stress
if
< f
s
㩷
OK
=
㩷
15.6
㩷
<
㩷
f
s
=
㩷
99
Tensile stress
short direction
䋺
if
1
< f
t
<
㩷
f
t
㩷
=
㩷
176
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
㩷 㩷 㩷 㩷
OK
1
=
㩷
14.3
㩷
㩷 㩷 㩷 㩷 㩷 㩷
1
< f
ts
<
㩷
f
ts
=
㩷
221.4
Long direction
䋺
if
2
< f
t
<
㩷
f
t
㩷
=
㩷
176
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
㩷 㩷 㩷 㩷
OK
2
=
㩷
13.0
㩷
㩷 㩷 㩷 㩷 㩷 㩷
2
< f
ts
<
㩷
f
ts
=
㩷
221.4
F
H
h
h
G
–(W - F
V
)
l
G1
l
1
n
1
F
H
G
- (
W -F
V
)
l
G2
l
2
n
2
F
H
N A
R
b1
A
R
b2
A
11
12
3
δ
δ
δ
δ
δ
δ
τ
τ
τ
δ
δ
δ
δ
τ
τ
7. Center of gravity position and earthquake resistant design
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...