Water heat exchange unit
H - 18
6. Installation construction
●
Securely install the water heat exchanger unit in a location that is sufficiently capable of withstanding the weight of
the unit. (Secure the unit with anchor bolts.) If the strength is insufficient then the water heat exchanger unit could
topple, causing injuries, etc.
●
Carry out the prescribed installation construction in preparation for typhoons and other strong winds, and earthquakes.
If there is a defect in the installation then this could cause an accident by overturning of the unit.
Warning
●
Do not install the water heat exchanger unit in locations where flammable gases are generated, flow in, accumulate or
leak, or where volatile flammable materials are handled. This could cause fires due to flammable materials or
flammable gases igniting.
●
Provide the required space for inspection and maintenance. (See Figure 2)
If this space is insufficient this could cause an accident by falling from installation location.
●
If the water heat exchanger unit is installed in a roof or other high position, provide a permanent ladder or hand grip
in order to prevent falls. Also provide a fence or hand grip around the water heat exchanger unit.
●
Install the unit in a location where drainage water can be easily managed.
If there is a defect then this could result in water leaks, leaks into property, etc.
•The drain pipes that pass indoors should be as short as possible.
•The drain pipes that pass indoors must be insulated.
•Make sure that the drain water does not cause trouble for the neighboring building.
●
Check that the unit is horizontal with a level.
If the unit is not horizontal then this could result in water leaks.
●
When the unit is being lifted in, do not turn it on it’s side.
This could damage the equipment, and cause a breakdown.
Warning
1
Avoid locations where there are machines that generate high frequencies.
2
If lifting in the water heat exchanger unit by suspending it
●
Suspend the unit by attaching ropes to the four suspension fittings on the base.
●
When attaching the rope, do so in way that does not damage or deform the external cladding, by using timber battens for
example.
●
When lifting by a crane, make sure that the crane hook is more than 1m from the unit.
3
If installing the water heat exchanger unit indoors, provide a drain pan underneath the unit to receive any water drops
that form from condensation, etc.
Figure 2
Anchor bolts M10 or larger
Figure 1 Anchor bolt positions
300 or m
o
re
50 or more
(50 or m
o
re
)
(300 or m
o
re
)
50 or m
o
re
On one side of
the unit provide
300mm or more
Water heat
exchanger unit
600 or more
(refrigerant
piping side)
(units : mm)
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...