Outdoor Unit
B - 3
(5) When using Propane
●
When using Propane as the gas fuel (Applicable model type:
SGP-E××× J2GU) it is necessary to adjust the fuel adjustment
valve and the gas type setting.
1
Fuel valve setting
• With the power supply breaker for the outdoor unit OFF
Remove the cover of the fuel distribution box.
Remove the 4×20 screws as shown in the diagram (4 locations)
and remove the bypass lid.
Reverse the bypass lid (concave part facing out) and fix it with the
removed screws.
Note: After fixing the lid, check that there is no gas leak. Fires can
be caused by leaking fuel gas etc.
Close the lid of the fuel distribution box.
Attach the “gas type setting/adjustment completed” label in the prescribed PL NAME position in the electrical control box.
2
Fuel Gas Type Setting
• Check that the fuel adjustment valve setting has been set before operating the outdoor control board.
Press the home key (S004) for longer than one second and the menu item number will be displayed.
Next, press the up (S007)/down (S006) key to set the menu item number to
.
After displaying
,
is displayed. When
is displayed press the set (S005) key. The
green LED (D053) lights up, and the system address setting is displayed.
(For example:
)
Next operate the down (S006)/up (S007) key, to display the gas type setting. When the gas type setting is displayed, press the set
(S005) key for longer than one second.
*When setting the gas type,
** is displayed.
(for ** enter 00-09•A0A-0F
A red LED (D052) lights up, indicating that a forced setting is being carried out. In this condition, press the down (S006)/up
(S007) key, and select the gas type.
*
The relationship between display and gas type is as shown in the following table.
After completing selection of gas type, press the set (S005) key for longer than 1 second. The red LED (D052) will be
extinguished.
Press the home (S004) key to complete the setting.
*When using propane, change the setting in accordance with the above procedure to
.
Display
Gas type
(GAS 00)
Propane G31
(GAS 01)
No use
(GAS 02)
Natural gas G20
Up key
(S007)
Down key
(S006)
(GAS 03)
Natural gas G25
1. Conditions for gas use
Bypass lod
when using LNG
4 x 20 screws
when using LPG
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...