Construction
E - 19
Forbidden
Indoot Unit
Indoot Unit
Indoot Unit
Indoot Unit
Indoot Unit
Outdoor Unit
Outdoor Unit
Outdoor Unit
Forbidden
Same refrigerant system
Same refrigerant system
Remote
control
Separately
sold item
Remote
control
Separately
sold item
Remote
control
Separately
sold item
Remote
control
Separately
sold item
Remote
control
Separately
sold item
Grounding
Grounding
Grounding
Grounding
Grounding
Grounding
Grounding
Earth leakage
breaker
Indoor/outdoor
operation cable
Remote control
wiring
Earth leakage
breaker
Earth leakage
breaker
Earth leakage
breaker
Indoor unit
1
Indoor unit
X
Indoor unit
2
Indoor unit
(UH)
Indoor unit
X
To other systems
Outdoor
unit 2
Outdoor
unit 1
Cen
tr
al con
tr
ol d
evi
ce A
Cen
tr
al con
tr
ol d
evi
ce B
2)Controlling indoor units on several refrigeration systems
Note 1) The power supply cabling for the indoor units should be carried out for each separate
refrigeration system.
(If this cannot be done then use the bus system or the relay at a pull box.
Also, power cabling for outdoor units should be separate for each outdoor unit.
Note 2) The signal cable from the centralized control device should be connected to be the same
signal cable as the indoor/outdoor operation cable. (no polarity)
Note 3) The maximum number of units that can be connected to the same signal cable is 64
indoor units, and 30 outdoor units.
Note 4) If the indoor/outdoor operation cable is connected in a loop then communication is not
possible. Therefore, do not connect in a loop.
Note 5 On the common communication cable (indoor/outdoor operation cable) outdoor unit
board S7 (terminal resistance ON/OFF switch), all units save one should be set to the OFF
side (when shipped from the factory they are
set to ON).
■
Cautions regarding the indoor/outdoor operation cable
Do not connect the cable in a loop.
3. Points regarding electrical construction (indoor unit)
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...