Design
D - 7
3. Refrigerant piping design
Outdoor unit
Branch piping
Main piping
after branch
Piping connected to
indoor units
Indoor unit
Main piping
Main piping after branch
Piping connected to indoor unit
Total allowable capacity of connected indoor units (kW)
Outdoor
unit
Outdoor piping size
35.6~
112.0
28.1~
35.5
16.1~
28.0
9.0~
16.0
Under
9.0
28.0 22.4
9.0~
16.0
4.5~
8.0
2.2~
3.6
Gas
25.4
25.4
19.05
15.88
- -
19.05
15.88
12.7
70 type
Liquid
12.7
12.7
9.52
9.52
- -
9.52
9.52
9.52
Gas
28.58
28.58
19.05
15.88
-
25.4
19.05
15.88
12.7
90 type
Liquid
12.7
12.7
9.52
9.52
-
12.7
9.52
9.52
9.52
Gas
31.75
31.75
28.58
19.05
15.88
28.58
25.4
19.05
15.88
12.7
120 type
Liquid
15.88
15.88
12.7
9.52
9.52
12.7
12.7
9.52
9.52
9.52
Gas
31.75
31.75
28.58
19.05
15.88
28.58
25.4
19.05
15.88
12.7
150 type
Liquid
19.05
19.05
15.88
12.7
9.52
9.52
12.7
12.7
9.52
9.52
9.52
Gas
38.1
38.1
31.75
28.58
19.05
15.88
28.58
25.4
19.05
15.88
12.7
190 type
Liquid
19.05
19.05
15.88
12.7
9.52
9.52
12.7
12.7
9.52
9.52
9.52
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
φ
(2) Selecting branch piping sizes
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...