Periodicinspection
G - 2
1. Periodic maintenance contract
In order to use a gas heat pump (GHP) air conditioning system for a long time, periodic inspection by a specialist service
person is necessary. The company operates a yearly periodic inspection contract system, so when the GHP is purchased
customers are encouraged to take out a contract.
After entering into a contract, a specialist service person will visit your installation for periodic inspection, at intervals
depending upon the number of hours of operation.
For further details regarding the inspection contract, please inquire at the dealer where this system was purchased or our
service company.
(1)Test run
A charge is made for periodic inspection.
Note
:
The periodic change period is calculated on the basis of 2,000 operating hours per year, and 13 years usable life. If it
becomes necessary to replace parts other than the above periodic replacement parts, there will be a charge separate from
the periodic inspection contract charge.
Note
:
If dust and dirt get into the fan of the outdoor unit heat exchanger this will result in reduced performance or breakdown.
Therefore, it is recommended that you consult with the dealer where the system was purchased or with a specialist service
company, and have the heat exchangers cleaned. (A charge will be made for this service)
(2)Guarantee period
One year from the day of completion of hand-over of the equipment after making test run.
However, for the engine and parts requiring periodic replacement, the period shall be the shorter of one year from the
date of completion of hand-over of the system after commissioning or 2,000 operating hours.
(3)Periodic inspection items outside the guarantee period.
The number of periodic inspections per year varies depending upon the hours of operating the heating and cooling
system.
The table below shows the case for 2,000 hours of heating/cooling operation in one year. If a periodic inspection
contract is concluded, then a GHP specialist service person will visit, carry out the indicated inspections, replace parts,
and make adjustments.
(
The time on site will be determined by the service person
)
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...