Design
D - 23
Condition Ordi
nary
standards
Special
standards
Morning
Daytime
Evening
Night
Area type
Sound
level
(phon)
Time
Sound
level
(phon)
Time
Sound
level
(phon)
Time
Sound
level
(phon)
Time
Near schools or
hospitals
(approximately
50m)
Type
1
Housing area,
school area, etc.
40
45
40
40
Same as the
standards on the
left
Type
2
Housing area,
undesignated area
45
50
8:00 am to
7:00 pm
45
7:00 pm to
11:00 pm
45
Type
3
Commercial, light
industrial,
industrial areas,
etc.
55
60
55
50
11:00 pm to
following
day 6:00 am
Type
4
Shopping area,
specially designated
area
60
6:00 am to
8:00 am
70
8:00 am to
8:00 pm
60
8:00 pm to
11:00 pm
55
5 phon lower
than the
standards on the
left
distance attenuation of operating sound
distance (m)
attenuation value dB(A)
attenuation for unit operating sound
attenuation
fo
r a point sound so
urce
(A)
(B)
Note: The values for unit operating sound are for a location with few reflecting
surfaces (bottom surface concrete)
(1) Installation location and sound-proofing measures
●
When there is no suitable installation location, and it is necessary to install in a narrow location, where there
are other houses, offices or buildings nearby, it is necessary to provide walls, sound absorption chambers or
other secondary sound-proofing measures.
●
Secondary sound-proofing measures include
• Attenuation through distance
• Sound-proofing with a noise barrier
• Sound-proofing using a sound absorbing chamber
• Sound-proofing by vibration isolation (anti-vibration pad, flexible couplings, etc.)
The following criteria are from Tokyo Pollution Prevention Regulations.
Criteria for every day sound levels (from Tokyo Pollution Prevention Regulations)
(2)Attenuation of sound through distance
●
The figure on the right shows the Figure 1
attenuation of sound with distance.
This is based upon operating sound at 1m from
the source of the sound.
(e.g.)
For a type 280 outdoor unit, the sound
at 3m distance in the 50Hz range, the
specification gives 56dB(A). On the
figure to the right for the 3m distance
point proceed vertically downward to the
crossing point (a) and then horizontally
to the left to the point (b): an
attenuation of 6.8dB(A) is obtained.
Therefore 56-6.8=49.2dB(A)
6. Sound-proofing measures
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...