Water heat exchange unit
H - 13
bnormality reset switch
(SW13)
Remote/local change
switch (SW11)
Cooling/heating
change switch (SW10)
Local operate/
stop switch (SW9)
End switch (SW12)
Indoor outdoor
communication monitor (LE16)
Abnormal
communication display (LE8)
Sensor abnormality
display (LED9)
Freezing abnormality
display (LED10)
Setting abnormality
display (LED11)
Interlock input monitor
(LED12)
External cooling/heating
input monitor (LED13)
Relay output monitor
(LE1)
Relay output monitor
(LE2)
Relay output monitor
(LE3)
Relay output monitor
(LE4)
Relay output monitor
(LE5)
Remote control output
monitor (LE18)
Remote control output
monitor (LE19)
Remote control output
monitor (LE20)
Special switch
(SW8)
Communication address
switch (SW6)
Parallel switch
(SW7)
Hot water temperature
setting switch (SW4, 5)
Cold water temperature
setting switch (SW2, 3)
Setting switch (SW1)
Outdoor unit address
switch (SW14)
Start up verification
display (LE21)
Heating display
(LE22)
Abnormality
display (LE23)
Outdoor operation input
monitor (LE15)
Outdoor stop input
monitor (LE14)
5. Control
(2) External terminal input specification
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...