Control
C - 6
Room temperature
sensor
<key-SW>
Operate/stop
Change operation
Te
mperature setting Higher
Te
mperature setting Lower
Air speed change
Select unit
Swing/air direction
T
imer setting
T
imer period Increase
T
imer period Reduce
Set
Delete
Filter reset
Inspection
Raise/lower filter
V
entilation
<Board>
Remote control address
connector
Liquid crystal display
Inlet temperature sensor
Outlet temperature sensor
<Coil temperature sensor>
Inlet
Intermediate
Outlet
Fan line protection
thermostat
Float SW
External start/stop
External remote control
disabled
Fan motor
Drain pump
Humidifier
Dust collector
Electromagnetic valve
Flap motor
Condensation
prevention heater
V
entilation
Dif
ference
Alarm signal
Operation monitor
signal
Compressor inlet pressure
Compressor outlet pressure
Compressor inlet temp
Compressor outlet temp
Outdoor heatexchanger inlet temp
Outdoor heatexchanger outlet temp
Outdoor air temp
Exhaust gas temp
Cooling water temp
Clutch coil temp(for MDL
120, 150, 190)
(Hot water outlet temp)
Starter motor current
Crank angle sensor
Cam angle sensor
Engine hydraulic SW
Oil float SW H level
Oil float SW L
level
Cold W
ater float SW
Fuel gas L
pressure SW
N/P
check SW
Key SWs(4)
Slide Sws(3)
Unit Control Line
Refrigerant H pressure SW
Power supply
POW
RA
Y
7 segment LED output/6 digits
LED output(4)
Crank case heater
4-way valve
Fuel gas valve 1
Engine oil supply pump
Oil supply solenoid valve 1, 2
Drain filter heater
Starter motor power supply
(Coolant heater)
Starter motor
Ignition 1, 2, 3, 4
Clutch(for MDL
120, 150, 190)
Expansion valve 1, 2
Liquid valve
By-pass valve
Cooling water 3-way motor valve
Fuel gas adjustment valve
Throttle(step motor)
(Hot water 3-way motor valve)
(Hot water pump)
Fuel gas valve 2
Fan motor 1
Fan motor 2(Only for MDL
190)
Cooling water pump
LED output(1)
CR
Multi-controller
Multi-controller
Indoor Unit
Outdoor Unit
Start/stop input
16
Control board
LED output
32
All/individual input
15
Indoor/outdoor unit control line
Personal Computer
RS232C
Indoor
unit
Outdoor
unit
Control board
Control board
Indoor/outdoor unit control line
Indoor/outdoor unit control line
Remote
control
cable
2. System block diagram
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...