1. Points regarding refrigerant piping construction
This size to be as long as possible
(This is the length to which the
adjoining pipe will be inserted.)
Internal dowel
Cutting position
This size to be as short as
possible (8mm or less)
This size to be as long as possible
(this is the length to which the adjoining
pipe will be inserted)
●
Component 1
●
Component 3
Internal dowel
Cutting position
Internal dowel
This size to be as short as possible
(2mm or less)
Brazed part
Cutting position
Internal dowel
This size to be as short as possible
(2mm or less)
Brazed part
This size to be as long as possible
Used vertically
(can be used pointing up or down)
Plus angle
(15-30 degrees)
Horizontal line
Outdoor unit side
Indoor unit side
Used horizontally
Horizontal line
Brazed component
Component 1
Component 3
Brazing location
Between B, C
Between D, E
●
After cutting, remove all burrs, and finish the end face correctly.
(If the pipe is badly bent or dented, use a tool to open the opening.)
●
Check that there is no dirt or foreign matter inside the pipe branch.
●
The pipe branch can be used horizontally or vertically (either pointing up or pointing down).
(1) Points regarding branch piping construction
●
Cut the component with a pipe cutter at the size/position corresponding to size of the on site piping, selected
based upon the total capacity of the indoor units. If the end size is the same as the on site pipe size, then it is
not necessary to cut the component.
Note
)
Cut the component so as not to distort the pipe. (The connecting pipe may not be able to be inserted.) Refer
to the installation construction
manual supplied with the outdoor unit for details of selecting the pipe size.
APR-CHXJ140S
APR-CHXJ280S
In this component there are positions where it has been brazed and those where it has been
processed to be continuous. The cutting position varies, so care is needed.
Cutting example :
1)Cutting at a non-brazed position 2)Cutting at a brazed position
●
Branch piping should be insulated with insulating material resistant to temperatures of 120
o
C or higher.
●
For further details, refer to the installation construction manual.
Note) The method of cutting at a location other
than where it has been brazed is the same
as cutting at a non-brazed position.
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...