Design
D - 9
3. Refrigerant piping design
Intake pipe or thick
pipe (gas pipe)
90°elbow
45°elbow
Tees
Socket
U bend
(R60~100mm)
Trap bend
Branch pipe
Header pipe
1
Ball valve for service
Not necessary to calculate an effective length
φ
φ
φ
φ
φ
φ
φ
φ
Effective length
R
d
45°bend 90°bend
180°bend
0.5 25.0×d 40.0×d
53.5×d
1.0 12.0×d 18.5×d
25.8×d
1.5
7.8×d
12.2×d
16.4×d
2.0
6.4×d
10.0×d
13.4×d
2.5
5.9×d
9.2×d
12.3×d
3.0
5.7×d
9.0×d
12.0×d
3.5
5.9×d
9.2×d
12.2×d
4.0
6.4×d
10.0×d
13.4×d
4.5
7.1×d
11.0×d
14.8×d
(4) Effective length of refrigerant piping
The effective straight length of the connectors used in the piping system is given in the table below. The piping system
design should be based upon this.
●
Effective straight length of connectors (Table 3)
●
Effective straight length of bent pipe (Table 4)
Calculation example
d: Outer diameter
R: Bend radius
(Example)
For a 19mm pipe bent through 90
o
on a 30mm radius (d=19, R=30)
from the table
length = 12.2 x 19 = 231mm
0.23 is the result.
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...