Construction
E - 15
Fuse(F3, 0.5A)
Indoor unit board
2P connector (brown)
EMG, CN44
to terminal board
2P connector (blue)
OC, CN40
Forbidden
Indoot Unit
Indoot Unit
Indoot Unit
Indoot Unit
Indoot Unit
Outdoor Unit
Outdoor Unit
Outdoor Unit
Forbidden
*1 Not counted as branch if less than 1m.
*2 The length of cable between branch point and branch point shall be 2m or greater.
Branch
*1
*2
Outdoor unit
Indoor unit
Indoor unit
Indoor unit
Indoor unit
Indoor unit
Indoor unit
Indoor unit
Outdoor unit
Outdoor unit
1m
or more
1m
or more
1m
or more
16 locations
or fewer
Cautions regarding the indoor/outdoor operation cable
1)Do not connect the cable in a loop.
2) If the cable is branched, it should be done at 16 or fewer locations. (branches within 1m are not
counted)
3) Check that the terminal board for the indoor/outdoor operation cable and terminal board for the remote
control cable are not connected to 230V AC.
❋
If they are mistakenly connected to 230V AC then the fuse on the indoor unit board (F3, 0.5A) will
blow in order to protect the board. After the cabling has been amended, remove the 2P connector
(blue, OC, CN40) connected to the board, and replace it with a 2P connector (brown, EMG, CN44).
(This operation must be done after first turning the power OFF.)
❋
If the remote control cabling is mistakenly connected to 230V AC then the indoor unit board will be
damaged.
■
Group Control
A maximum of 8 indoor units can be connected to one remote control.
Note 1) Use the indoor unit sensor (body sensor) for control. When shipped from the factory the indoor unit
sensor is set, so no operations are required.
Note 2) The floor installed type(SGP-EEH) does not have a terminal board for remote control, so group
control cannot be done.
3. Points regarding electrical construction (indoor unit)
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...