Design
D - 11
3. Refrigerant piping design
(6) Checking the density limit
*
The following is for R-22, but is also applicable to R-407C.
In a multi-type system, as the length of refrigerant pipes gets longer the additional charge amount of refrigerant
increases. Therefore there is a danger that if refrigerant should leak in a small room the occupants of the room could
suffocate. According to the standard “Standards for Cooling Air Conditioning Equipment” (KHK-S0010) issued by the
High Pressure Gas Safety Institute of Japan,
If the density is less than 0.3 kg/m
3
no special measures are required. If the density is greater than 0.3 kg/m
3
then special
measures are required.
Guidelines for ensuring safety of multi-type package air conditioning systems during a leak of refrigerant
If the density limit does not satisfy the equation, then the following guidelines must be followed in selecting the system,
construction and setting of the mechanical ventilation system.
1
Selection of air conditioning system
The maximum quantity of refrigerant that can be used for a given volume of room is as shown in Figure 1, above the sloping
lines. If this condition is not satisfied then either an effective opening must be provided to the room for ventilation, making
the volume larger, or the outdoor unit capacity or the piping length must be re-considered in order to reduce the total
quantity of refrigerant. However, if two or more independent means of securing the safety of occupants in the case of a leak
of refrigerant are taken, then this requirement need not be fulfilled.
2
Selection of outdoor unit type
It is recommended that the outdoor unit is positioned 2m or higher from the floor.
3
Restrictions on pipe connections within living quarters
Pipe connections must conform to JIS-B-8607 (flare type and brazed type fittings for refrigerants), and after being properly
installed and completed, they must be tested for gas-tightness.
4
Combination with ventilation system
a) A mechanical ventilation system shall be used in combination with the air conditioning system in order to dilute the
concentration of any refrigerant leak.
b) It is desirable that the mechanical ventilation system introduces air into the room from a height of 2m or more.
c) The ventilation rate of the ventilation system shall be equal to or greater than the quantity indicated in Figure 1 for the
refrigerant quantity and room volume.
d) In the lowest part of the room there must be an opening that will permit effective ventilation (a gap under a door, etc.
e) The ventilation system must always operate, regardless of whether the air conditioning system is operating or not, or
whether the room is occupied or not. If this is not possible then a sensor system to detect refrigerant leak, and
automatically activate ventilation shall be provided.
5
Restrictions on piping installation and items for caution
a) The piping must be provided with earthquake-resistant supports, so that there will be no damage to the piping in an
earthquake or other externally applied force.
b) Where pipes are supported, they shall be provided with a clearance to allow axial movement, so that thermal stresses do
not accumulate.
6
Flowchart for dealing with refrigerant leaks
•Omitted
Total quantity of refrigerant in refrigerant equipment (kg)
Volume of the smallest room with an indoor unit installed (m
3
)
Density limit 0.3 kg/m
3
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...