Basic Configuration
5-40
#"
To transfer the configuration parameters to the Gateway
•
Click
Yes
at the Confirm screen. An ‘Updating node parameters’ message is displayed
while the system transfers the parameters to the Gateway.
If there are any ongoing calls when you try to upload the configuration parameters, a
warning is displayed. If you choose to upload the parameters anyway, the Gateway
disconnects all active calls gracefully (i.e., from each endpoint, the call appears to have been
disconnected at the other endpoint), and restarts.
The Gateway restarts automatically upon uploading the new configuration. Wait for the
Gateway to complete the restart process before you operate it. The unit may take longer to
restart than the time allotted in the transferring time bar displayed by the configuration
software.
Summary of Contents for L2W-323
Page 1: ...P N 61285 00001 Rev A L2W 323 GATEWAY User Guide ...
Page 2: ......
Page 4: ......
Page 16: ......
Page 24: ......
Page 48: ......
Page 50: ......
Page 64: ......
Page 76: ......
Page 118: ......
Page 120: ......
Page 156: ......
Page 174: ......
Page 202: ......
Page 215: ...Appendix A Cable Connectors and Pin outs ...
Page 216: ......
Page 222: ...Appendix B Safety Considerations ...
Page 223: ......
Page 225: ...Appendix C IP Addressing ...
Page 226: ......
Page 231: ...Appendix D Technical Specifications ...
Page 232: ......
Page 235: ...Appendix E FCC Part 68 Customer Instructions ...
Page 236: ......