SECTION 01: ENGINE
14
DOB 2490-2789 | X3-45 Commuter PA1605 Maintenance Manual (Final Version – Rev.2 April 2016)
FIGURE 10: ENGINE COMPARTMENT X3 COMMUTER (TYPICAL)
01184_B
1.5 POWER PLANT ASSY. INSTALLATION
To install a power plant assembly, follow the
same procedure as in "Power Plant Assembly
Removal" except in reverse order, then proceed
with the following:
1. Torque the power plant cradle mounting
bolts to 190 lbf-ft (258 Nm).
2. Remove bolts B and D. Untighten bolts A
and C then pivot oil cooler as per figure 12.
Install bolts B and D and tighten all bolts.
3. Refill cooling system with saved fluid (refer
to Section 05, COOLANT SYSTEM).
4. Once engine fuel system has been drained,
it will aid restarting if fuel filters are filled with
fuel oil (refer to Section 03, FUEL SYSTEM).
5. Start engine for a visual check. Check fuel,
oil, cooling, pneumatic and hydraulic system
connections for leakage. Test operation of
engine controls and accessories.
FIGURE 11: NORMAL OIL COOLER POSITION