SECTION 18: BODY
12
DOB 2490-2789 | X3-45 Commuter PA1605 Maintenance Manual (Final Version – Rev.2 April 2016)
thickness is 10 mils wet or 5 mils dry
.
7.0 Remove all masking material 30 minutes after
application.
ANNEX 1
1. Check and confirm that dew point and surface temperature are in accordance with to the following
criteria:
Surface temperature > 10°C
Surface temperature > or = to dew point + 3°C
NOTE
Use the following table to determine dew point
.
2.
Check and confirm that TECTYL temperature is between 10°C and 35°C.
DEW POINT
Relative Humidity (%)
10 20
30
40
50
60
70
80
90
100
Temp (c)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
---
-16
-11
-8 -5 -3 -1 0 1 3
---
-15
-10
-7 -5 -3 -1 1 2 4
---
-14
-10
-6 -4 -1 0 2 3 5
---
-13
-9 -5 -3 -1 1 2 4 6
---
-13
-8 -5 -2 0 2 4 5 7
---
-11
-7 -4 -1 1 3 5 6 8
---
-11
-8 -3 0 2 4 6 7 9
-18 -10
-6 -2 0 2 5 6 8 10
-17 -9 -5 -1 1 4 6 7 9 11
-16 -9 -4 -1 2 4 6 9 10
12
-16 -8 -3 0 3 5 7 10
11
13
-15 -7 -3 1 4 6 9 10
12
14
-14 -6 -1 2 5 7 10
11
13
15
-14 -6 -1 2 6 8 10
12
14
16
-13 -5 0 4 6 9 11
14
15
17
-12
-4 1 4 7 10 12 14 16 18
-11
-4 1 5 9 11 13 15 17 19
-10
-3 2 6 9 12 14 16 18 20
-10
-2 3 7 10 13 15 17 19 21
-9
-1 4 8 11 14 16 18 20 22
-9
0
5 9 12 15 17 19 21 23
-8
0
5 10 13 16 18 20 22 24
-7
1
6 11 14 16 19 21 23 25
-6
2
7 11 15 17 20 22 24 26
-6 2
8
12 16 19 21 23 25 27
-5
3
9 13 16 20 22 24 26 28
-4
4
10 14 17 20 23 25 27 29
-4
5
11 15 19 21 24 26 28 30