Note 2:
I/O break conditions cannot be set.
Previously, it was necessary to start the CX-Simulator by selecting
Work Online Simulator
from the CX-
Programmer's PLC Menu, transfer the program to the CX-Simulator in the computer, and execute the debugging
operation from the CX-Simulator’s debugging console. With the CX-Programmer Ver. 6.1, the debugging
operation can be executed from the CX-Programmer’s toolbar.
The display can be made to scroll automatically during Step Run or Continuous Step Run operation. Also, the
break points can be displayed in a list and the display can be made to jump to a specified break point in the list.
Procedure for Simulation Function Operation
1, 2, 3…
1. Open the program that you want to debug.
2. Select
View - Toolbars
and select the
Simulator Debug
Option in the
Toolbars
Tab.
3. Select
Work Online Simulator
from the CX-Programmer's
PLC
Menu and transfer the
program to the CX-Simulator in the computer.
Note:
Steps 2 and 3 can be done in the opposite order.
The following icons will be displayed in the toolbar:
Note:
For details on the Step In and Step Out commands, refer to the
CX-Programmer Ver. 6.1
Operation Manual: Function Blocks
(catalog number W447). For details on the Step Run,
Continuous Step Run, Scan Run, and Set/Clear Break Point commands, refer to the
CX-
Simulator Operation Manual
(catalog number W366).
4. Each debugging operation can be executed by clicking the corresponding icon in the
toolbar or selecting the corresponding menu command from the menu.
Note:
Set the duration of the step execution during Continuous Step Run operation by selecting
Tools - Options - Continuous Step Interval
in the CX-Programmer.
Automatic Scrolling for Step Run Operation
The Simulator can be set to automatically scroll the display to the paused point in the program when performing
Step Run or Continuous Step Run operation. To set scrolling, select
Tools - Simulation - Always Display
Current Execution Point
.
Break Point List/Jump Function
A break point is a point in the ladder program where execution is paused temporarily. With the CX-One Ver 1.1
(CX-Programmer Ver. 6.1 and CX-Simulator Ver. 1.6), it is possible to list the break points set for the active
project’s PLC and jump to a specified break point position in that list.
1, 2, 3…
1. Select
Tools - Simulation – Break Point List
.
2. The Break Point List Dialog Box will be displayed.
3. Click
the
Jump
,
Delete
, or
Delete All
Button to jump to a point in the list or delete break
points.
PLC-PT Integrated Simulation
When using CX-Programmer Ver. 7.2 or higher (CX-One version 2.1 or higher), the CX-Designer’s offline test
function can be used to debug the interactive operation between a CS/CJ/CP/NSJ-series CPU Unit program and
NS-series PT touch panel screen data.
Note 1:
The PLC – PT integrated simulation can operate only with the combination of a CS/CJ-series,
CP-series, or NSJ-series PLC and an NS-series PT.
2:
This function cannot be used unless the CX-Designer and CX-Simulator are installed when
the CX-One Integrated tool Package is installed.
Select
Simulation
–
PLC-PT Integrated Simulation
. It is also possible to select the CX-Programmer project’s
first PLC in the project workspace, right-click to display the pop-up menu, and select
PLC-PT Integrated
Simulation
.
Summary of Contents for CX-PROGRAMMER V9
Page 1: ...Cat No W446 E1 12 CX Programmer Ver 9 CXONE AL_C V4 AL_D V4 SYSMAC OPERATION MANUAL...
Page 2: ......
Page 3: ...SYSMAC CX Programmer Ver 9 CXONE AL C V4 AL D V4 Operation Manual Revised July 2010...
Page 4: ......
Page 6: ......
Page 32: ......
Page 33: ...PART 1 CX Programmer...
Page 34: ......
Page 91: ......
Page 111: ......
Page 191: ...PART 1 CX Programmer CHAPTER 4 Reference OMRON CX Programmer _Page 108...
Page 217: ......
Page 233: ......
Page 234: ...PART 2 CX Server PLC Tools...
Page 235: ......
Page 243: ......
Page 249: ......
Page 261: ...PART 2 CX Server PLC Tools CHAPTER 2 PLC Memory Component OMRON CX Server PLC Tools_Page 18...
Page 280: ......
Page 333: ......
Page 377: ......
Page 409: ......
Page 430: ......
Page 431: ...PART 3 CX Server Runtime...
Page 432: ......
Page 476: ......
Page 482: ......
Page 498: ......
Page 524: ......
Page 534: ......
Page 535: ......
Page 536: ......