87
Computing the Cycle Time
Section 2-7
executed in order of priority after the current interrupt task has completed
execution and the software interrupt response time has elapsed.
The interrupt response time of input interrupt tasks is calculated as follows:
Interrupt response time = Input ON delay + Software interrupt response time
Scheduled Interrupt Tasks
The interrupt response time of scheduled interrupt tasks is the time taken
from after the scheduled time specified by the MSKS(690) instruction has
elapsed until the interrupt task has actually been executed. The length of the
interrupt response time for scheduled interrupt tasks is 1 ms max. There is
also an error of 80
µ
s in the time to the first scheduled interrupt (0.5 ms min.).
Note
Scheduled interrupt tasks can be executed during execution of the user pro-
gram (even while an instruction is being executed by stopping the execution of
an instruction), I/O refresh, peripheral servicing, or overseeing. The interrupt
response time is not affected by which of the above processing operations
during which the scheduled interrupt time occurs. Scheduled interrupts, how-
ever, are not executed during execution of other interrupt tasks even if the
interrupt conditions are satisfied. Instead, the interrupts are executed in order
of priority after the current interrupt task has completed execution and the
software interrupt response time has elapsed.
2-7-9
Serial PLC Link Response Performance
The response times for CPU Units connected via a Serial PLC Link (master to
slave or slave to master) can be calculated as shown below. If a PT is in the
Serial PLC Link, however, the amount of communications data will not be
fixed and the values will change.
• Maximum I/O response time (not including hardware delay) =
Master cycle time + Communications cycle time + Slave cycle time + 4 ms
• Minimum I/O response time (not including hardware delay) =
Slave communications time + 0.8 ms
Input
(Interrupt signal retrieval)
Interrupt task execution
Input interrupt task
response time
Software interrupt response time
Input ON delay
Cyclic task execution
(main program)
Ladder program
execution time
Return time from
input interrupt task
Next interrupt signal
can be accepted.
The time from completing the ladder program in the input
interrupt task until returning to cyclic task execution is 60
µ
s.
Software interrupt response time
Internal timer
Scheduled interrupt task
Scheduled interrupt time
Summary of Contents for CP1L-L14D Series
Page 2: ...CP1L L14D CP1L L20D CP1L M30D CP1L M40D CP1L CPU Unit Operation Manual Revised June 2007...
Page 3: ...iv...
Page 9: ...x...
Page 13: ...xiv TABLE OF CONTENTS...
Page 21: ...xxii...
Page 33: ...xxxiv Conformance to EC Directives 6...
Page 65: ...32 Function Blocks Section 1 5...
Page 153: ...120 CP CPM1A series Expansion I O Unit Wiring Section 3 6...
Page 523: ...490 Troubleshooting Unit Errors Section 9 4...
Page 531: ...498 Replacing User serviceable Parts Section 10 2...
Page 563: ...530 Auxiliary Area Allocations by Function Appendix C...
Page 611: ...578 Auxiliary Area Allocations by Address Appendix D...
Page 638: ...605 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Page 639: ...606 Connections to Serial Communications Option Boards Appendix F...
Page 669: ...636 Index...
Page 671: ...638 Revision History...