156
SuperScript 4400 — Maintenance Guide
7.4.3 Fuser Clutch (FUCL)
Tools
Phillips Screwdriver #1, #2
Slotted Screwdriver #1
Disassembly Procedures
1.
Remove the side cover (R). (See the item
7.1.3.)
2.
Remove the connector connected with
IOD2 Circut Card.
3.
Remove the C ring from the shaft.
4.
Pull out the fuser clutch from the shaft.
Assembly Procedures
1.
Install a new fuser clutch to the shaft.
2.
Install the C ring to the shaft's groove,
and secure the fuser clutch.
3.
Connect the connector with the IOD2
Circut Card.
4.
After the above , follow exactly the
reverse order of disassembling
procedures.
Fuser Clutch
C ring
Summary of Contents for Super Script 4400
Page 1: ...NEC SuperScript 4400 4400N Maintenance Guide 18 September 1998 Part Number 703 A0240 001 ...
Page 3: ...i SuperScript 4400 Maintenance Guide ...
Page 61: ...52 SuperScript 4400 Maintenance Guide ...
Page 71: ...62 SuperScript 4400 Maintenance Guide ...
Page 125: ...116 SuperScript 4400 Maintenance Guide ...
Page 189: ...180 SuperScript 4400 Maintenance Guide Toner Sensor TPD Toner Sensor TTR Fram Ass y ...
Page 193: ...184 SuperScript 4400 Maintenance Guide Stay A Ass y Transfer Drum ...
Page 203: ...194 SuperScript 4400 Maintenance Guide Stay A Ass y ...
Page 267: ...258 SuperScript 4400 Maintenance Guide ...
Page 273: ...264 SuperScript 4400 Maintenance Guide ...
Page 287: ...XIV SuperScript 4400 Maintenance Guide F G H I J ...
Page 289: ...XVI SuperScript 4400 Maintenance Guide ...
Page 293: ...ii Superscript 4200N and 4400 Series Maintenance Guide Addendum ...
Page 295: ...iv Superscript 4200N and 4400 Series Maintenance Guide Addendum ...
Page 302: ...7 ...
Page 314: ...19 NOTES ...
Page 315: ...20 Superscript 4200N and 4400 Series Maintenance Guide Addendum ...
Page 316: ......