
Table 8.6 defines the modulation parameters for applying temperature compensation to a standard
12 V lead acid battery using a XR16-250 power supply. The modulation control parameter
should be set to voltage control and modulation type should be set to 1.
Table 8.3
CHARGING PROGRAMMING AND CHARACTERISTICS
PARAMETER
STEP 1
BULK
CHARGE
STEP 2
ABSORPTION
CHARGE
STEP 3
EQUALIZATION
CHARGE
STEP 4
FLOAT
CHARGE
MEMORY STEP
VOLTAGE SET
CURRENT SET
OVT
OCT
PERIOD
0
Vbc
Imbc
105%•Vbc
110%•Imbc
6 hours
0
Vbc
Imbc
105%•Vbc
110%•Imbc
6 hours
1
Vec
Imec
105%•Vec
110%•Imec
1 hours
2
Vfc
Imec
105%•Vfc
110%•Imec
MODE OF
CONTROL
Current
Voltage
Current/Voltage
Voltage
Notes:
Vbc: Bulk charge voltage
Vec: Equalize charge voltage
Vfc: Float charge voltage
Imbc: Maximum bulk charge current (25% of AH capacity maximum)
Imec: Maximum equalization charge current (10% of AH capacity maximum)
Table 8.4
BATTERY CHARGING PER CELL
CHARGING VOLTAGE RANGE
BATTERY TYPE
BULK
Vbc (Vdc)
EQUALIZE
Vec (Vdc)
FLOAT
Vfc (Vdc)
WET STANDARD (Sb/Sb) DEEP CYCLE
WET LOW MAINTENANCE (Sb/Ca)
WET MAINTENANCE FREE (Ca/Ca)
VRLA AGM
VRLA GEL CELL
2.417 - 2.467
2.400 - 2.433
2.467
2.400 - 2.467
2.350 - 2.400
2.567 - 2.667
2.517 - 2.733
2.583 - 2.717
NA
NA
2.167 - 2.200
2.183 - 2.200
2.183 - 2.233
2.200 - 2.300
2.200 - 2.300
Notes:
1) Ca: Calcium, Sb: Antimony
2) VRLA: Valve regulated lead acid
3) AGM: Sealed absorbed Glass Mat, also known as started electrolyte
102
Summary of Contents for XR III series
Page 1: ...OPERATING AND SERVICE MANUAL XR SERIES III DC POWER SUPPLIES...
Page 2: ......
Page 3: ...MAGNA POWER ELECTRONICS INC 39 ROYAL ROAD FLEMINGTON NJ 08822 February 20 2012...
Page 4: ......
Page 88: ...Figure 4 1 Status Byte Generation Figure 4 2 ESE and ESR Generation 76...
Page 95: ...IEEE Standard CLS ESR ESE STB SRE IDN SAV RCL RST Notes 1 C command Q query 83...
Page 97: ...Figure 5 1 Configuration setup Figure 5 2 GPIB communications setup 85...
Page 99: ...Figure 5 4 Virtual Control Panel Figure 5 5 Command Panel 87...
Page 102: ...Figure 5 7 Calibration Panel Figure 5 8 Firmware Panel 90...
Page 103: ...Figure 5 9 Modulation Panel 91...
Page 123: ...Figure B 1 Information Panel Figure B 2 Configure Panel 111...
Page 124: ...Figure B 3 Reboot in Progress Panel Figure B 4 Web Control Panel 112...