MI 3321 MultiservicerXA
Instrument description
17
The DUT should be switched on (to ensure that the
complete circuit is tested).
Connect the lead to be tested to the TP1 test terminal.
Connect the cord to be tested to the IEC test terminal.
Connect current clamps for this test.
Test leads resistance in Earth bond and Continuity functions
is compensated.
Test passed.
Test failed.
Some tests in the autotest sequence were skipped, but all
performed tests passed.
2.4 Two rated supply voltages
The MultiservicerXA will operate either at 110 V or 230 V, 50 Hz or 60 Hz mains supply
input.
Notes:
The PAT will conduct a leakage / power tests at the power up mains voltage.
Therefore, to perform a run test on a 110 V DUT (e.g. 110 V drills), the PAT must
be powered from a 110 V mains supply (or center tapped transformer).
The mains voltage does not influence other measurements.