
78
[5] Eco mode switch / Boom lift bypass switch
When Eco mode is selected, the upper limit for the engine
speed in crane mode is set, restricting the fuel
consumption.
・
N : Normal Mode
・
E : Eco Mode (setting upper limit for the engine speed)
NOTES
Note that Eco Mode can be selected only when the crane
is in Crane Mode.
While pushing the switch, or while touching the screen,
the boom raise restriction under overload condition is
canceled and you can raise the boom.
[6] DPF regeneration switch
If the DPF regeneration request lamp is lit, carry out DPF
regeneration by pressing the DPF regeneration switch.
For the procedures for regeneration, refer to
“
OPERATION 2.27 DPF STATIONARY REGENERATION
METHOD
”
section.
CAUTION
The machine cannot be operated at all during DPF
stationary regeneration.
Regeneration takes about 25 to 30 minutes so
complete preparations before implementing
regeneration.
[7] Setting switch
Use this switch to change the current screen to the User
Initial Mode screen.
For details of the screen, refer to “OPERATION 1.2.1 [5]
MONITOR DISPLAY (USER INITIAL MODE)” section.
[8] Engine and electric motor switch
Use this to switch the power output source of the machine.
Pushing this switch when the starter switch is in the “ON”
position will display a pop-up screen. When the pop-up
screen appears, you can change the power source mode
between “Engine” and “Electric Motor” with the pop-up
select switch (up/down) or touchscreen operations.
CAUTION
The power source mode cannot be changed during
engine startup.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......