
141
6. Operate the right control lever (1) slowly right and left
and move the derrick cylinder up and down until it
reaches the stroke end while checking if there is any
abnormality with the operation.
Repair if any abnormality is found.
7. Operate the left control lever (2) slowly back and forth,
and repeat extension and retraction of the boom until it
reaches the stroke end while checking if there is any
abnormality with the operation.
Repair if any abnormality is found.
8. Operate the right control lever (1) slowly back and forth
to check the following: the hook block is smoothly
wound/unwound, the hook block immediately stops
when the right control lever is shifted back to the
“NEUTRAL” position, and irregular winding does not
occur in the winch drum.
Repair if any abnormality is found.
9. Operate the left control lever (2) slowly back and forth
to check the following: the crane smoothly slews 360
degrees or more clockwise and counterclockwise, and
the crane stops immediately when the left control lever
is shifted back to the “NEUTRAL” position.
Repair if any abnormality is found.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......