
127
1.6 OVER HOIST DETECTOR
CAUTION
When winding the hook block, be careful of clearance between the hook block and
boom.
Also, the hook block can be wound when the boom is extended.
Perform boom extension operation while always checking the hook block height.
(1) Hook block
(2) Over hoist detector
(3) Weight
(4) Boom
The over winding detector alerts the operator to the occurrence of over winding with an
intermittent buzzer sound, while the hook block (1) is wound or the boom (4) is extended, or
when the weight (3) is pushed upward due to hook block (1) approaching the boom (4).
At the same time, the winding of the hook block (1) and the extension of the boom (4) stop
automatically.
When you hear the alarm buzzer sound, immediately shift the right control lever to the
“UNWIND”position, or shift the left control lever to the “RETRACT” position, in order to unwind
the hook block (1).
NOTES
When this switch is in the “ON” position, the tricolor revolving light illuminates in red.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......