
280
[Checking operation of outrigger interlock]
1. Install all four outriggers.
2. Press the mode switch (6) of the monitor or touch the
screen to enter the “crane mode”.
3. Move the operation lever on the right to the right
direction (rise) and raise the boom until the crane stowage
position lamp (1) of the monitor turns off.
4. Press the mode switch of the monitor or touch the
screen to enter the “outrigger mode”.
5. Press the mode switch (5) of the monitor or touch the
screen to enter the “contact” mode.
6. Press the mode switch (6) of the monitor or touch the
screen to enter the “manual” mode.
7. Turn the outrigger contact switch (7) on the outrigger
control panel to “In” position and make sure the
outrigger does not operate.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......