
361
18. Reconnect the left section of the main boom tip and the
harness of the left section of the fly jib base, following the
procedure below.
(1) Disconnect the plug of the dummy connector (E3).
(2) Disconnect the connector B (E5) from the connector
(E2) on the main boom side and reconnect the
connector B (E5) to the dummy connector (E3).
(3) Disconnect the connector A (E4) from the connector
on the fly jib side (E1) and reconnect the connector A
(E4) to the connector on the main boom side (E2).
(4) Connect the plug to the connector on the fly jib side
(E1).
CAUTION
• The fly jib will not function unless you reconnect the
harness. Make sure to reconnect it.
• Check that the connector of the reconnected harness is
securely inserted.
• Use plugs on the unconnected ends to protect
connectors.
19. Reconnect the hydraulic hoses on the right section of the
main boom tip and on the right section of the fly jib base,
following the procedure below.
(1) Remove the cap of the couplers 1 (F1) and 2 (F2).
(2) Disconnect the coupler 3 (F3) of the hydraulic hose A
(F5) stowed in the fly jib side and reconnect it to the
coupler 2 (F2) on the main boom side.
(3) Disconnect the coupler 4 (F4) of the hydraulic hose B
(F6) stowed in the fly jib side and reconnect it to the
coupler 1 (F1) on the main boom side.
(4) Attach the cap to the couplers 3 (F3) and 4 (F4).
CAUTION
• The fly jib will not function unless you reconnect the
hydraulic hose. Make sure to reconnect it.
• If the coupler is dirty, attach the coupler after cleaning it.
• Check that the coupler is securely inserted to the
reconnected hydraulic hose.
FLY JIB STOWED
FLY JIB SET
FLY JIB STOWED
FLY JIB SET
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......