
167
4. Operate hook raising or hook lowering to adjust hook
position and secure the hook block to the hook stowage
wire.
NOTES
If the hook block is excessively wound, the over hoist
detector is activated, generating an alarm buzzer. This
allows the winding operation to automatically stop.
5. Change the mode change switch (3) to “Hook
stowage” on the monitor. The hook is wound
automatically; stowing the hook (4).
NOTES
In case of temporary stowage or short distance
self-travelling, you can stow the hook block simply to the
boom head, instead of stowing to the hook stowage wire.
6. Make sure that the crane stowage lamp (1) on the
monitor is lit in yellow.
NOTES
If the crane stowage lamp (1) is not lit in yellow, perform
again the said operation, fully retract and lower the boom,
or slew the boom.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......