
212
4.3 MACHINE OPERATION
CAUTION
After warm-up operation, before operating the crane, see from “OPERATION 2.5
MACHINE TRAVELLING POSTURE” to ”OPERATION 2.25 PROHIBITED OPERATIONS
DURING CRANE WORK”.
4.4 MACHINE STOP AND CHECKS AFTER STOPPING MACHINE
1. Turn the starter switch key to the “OFF” position.
The electric motor stops.
2. Remove the starter switch key.
3. Visually check for oil leakage, and check around the
crawlers, crane, and exterior of the machine. If you find
any leakage or abnormality, fix the problem.
4. Clean off the crawlers and outriggers, removing mud.
5. Keep the area around the inverter unit free of dead
leaves and paper waste. A potential fire could occur if
disregarded.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......