
50
4.4 PRECAUTIONS FOR TERMINATING CRANE OPERATION
(REMOTE CONTROL SYSTEM)
PRECAUTIONS FOR TERMINATING THE OPERATION BY THE TRANSMITTER
• Before stowing the outriggers, ensure that the boom and fly jib are stowed in the correct
positions.
• Before stowing the outriggers, set the operation mode to the “OUTRIGGER MODE” and
check that the mode is switched correctly.
• When all the operation of the Transmitter is complete, always turn “OFF” the power of the
Transmitter.
• Under no condition will the Transmitter be ON unless the Crane is in operation. Be sure to
keep the power turned “OFF”. Otherwise, unexpected touching or contact of operation levers
or buttons of the Transmitter with any other object may cause undesired motion of the Crane
and a serious accident such as tipping or collision may occur.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......