
366
3. Attach the wire rope to the hook block, following the procedure below.
(1) According to the number of falls of the wire rope, draw the wire rope through the sheave of the
boom tip and the hook block sheave as shown in the figure below.
(2) Draw the tip of the wire rope (12) through the weight of
over-hoist detector (42) of the over-winding detector.
(3) Draw the wire rope (12) through the wedge socket
(37).
(4) The rope wedge (41) should be in position (a), and
yank at the wire rope (12) in the direction indicated by
the arrow.
(5) Fix a wire clip (40) to the wire rope (12) according to
the dimensions specified in the sketch at the right.
(6) Secure the wedge socket (37) to the boom with the
wedge socket pin (38), and tighten the wedge socket
pin (38) and the bolt (39).
NOTES
When lifting the hook block from the grounding surface, the
boom should be in a raising operation.
Do not operate the winch lever since it will cause irregular
winding.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......