
381
8. INSPECTION AND MAINTENANCE
CAUTION
In this section, only the equipment with the fly jib specification, different from the standard
specification is described.
See “Inspection and maintenance” for details on the machine not described in this section.
8.1 PRE-OPERATION INSPECTION
Check the following in this section before starting the work after attaching a fly jib every day.
[1] Check around fly jib
• Check for any cracks or significant deformation or dirt in parts of a fly jib. Also, check for the loosened,
missing or damaged bolts, nuts, and pins. Especially check each position pin for any significant wear
and damage. Repair if any abnormality is found.
• Check the sheave and guide roller for any significant wear. Replace the parts if any abnormality is
found.
• Check wire rope for over hoist detector weight of the over hoist detector on the fly jib tip for any
significant damage or deformation. Repair if any abnormality is found.
• Check code reel on the left side of fly jib for any significant damage or deformation. Also, check for any
damage on the code reel cables and make sure they operate smoothly. Repair if any abnormality is
found.
• Check for slack wiring, lose connections and any trace of burning. Repair if any abnormality is found.
[2] INSPECTION OF HOOK BLOCK
• Check that the wire rope latch (1) is working properly.
Repair if any abnormality is found.
• Rotate the hook and check that it rotates smoothly and
there is no noise coming from the trunnion.
Repair if any abnormality is found.
• Check the hook for any cracks, significant deformation or
dirt.
Repair if any abnormality is found.
[3] INSPECTION AND ADJUSTMENT OF DERRICK WIRE ROPE
[Inspection of derrick wire rope]
1. Fully extend the fly jib derrick cylinder.
2. Make sure the fly jib base surface (P) and No.1 fly jib
surface (Q) are parallel.
If these are not parallel, refer to the section “Adjustment of
derrick wire rope” and adjust to parallel.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......