
303
[3] GREASING OF MACHINE UNITS
CAUTION
• Grease type varies with greasing points. Failure to grease properly may shorten the
machine life. Follow the table “Grease type” below.
• Greasing a new machine is required once every 10 hours until the machine attains the
first 100 hours of operation that initial fit emerges.
• Use proper grease specified below according to the greasing points.
No.
Greasing point
Grease type
1
Greasing of the boom mounting pin
1 place
Lithium grease
2
Greasing of the derricking cylinder bottom mounting
pin
1 place
3
Greasing of the derricking cylinder rod mounting pin
1 place
4
Greasing of the outrigger rotary shaft
4 places
5
Greasing of the outrigger contact cylinder bottom
mounting pin
4 places
6
Greasing of the outrigger contact cylinder rod
mounting pin
4 places
7
Greasing of the slewing gear
1 place
8 Greasing
of
the sheave
1 place
9 Greasing
of
the
hook block
1 place
10
Greasing of the boom top slide plate
8 places
Neo grease
(grease for boom)
11
Greasing of the boom bottom slide plate
8 places
12
Greasing of both sides and underside of the boom
Each
boom
13
Greasing of the boom extending and retracting wire
ropes
2 pieces
Rope oil
14
Greasing of the winch wire rope
1 piece
1. Using the grease gun, inject grease through corresponding grease plugs indicated in the
arrow (see next page) of the above table “No.1 – 9”.
2. Wipe off old grease squeezed out after greasing.
3. Place the outriggers when greasing the outrigger cylinders.
4. Pull the right operation lever inward to raise the boom slightly for greasing the derricking
cylinder mounting pin and slide plate located on the top surface of the boom.
5. Push the left operation lever forward to extend the boom for greasing both sides and
underside of the boom and wire rope.
6. Apply red rope grease to prevent wire rope abrasion and rust formation.
With the rope surface cleaned, grease the rope with a brush.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......