
223
8.3 AFTER STORAGE
If you did not perform antirust operation monthly during the long-term storage, contact
us or our sales service agency before using the machine.
Perform the following before using the machine after the long-term storage.
• Refuel, grease, and change the oil without fail.
• Remove the battery cover (install the battery if it is removed from the machine), and check the
electrolyte level and specific gravity, and then connect the battery cable at the (+) side first.
• Remove the drain plug of the fuel tank, hydraulic oil tank, and engine oil pan to drain any water
ingress.
• Carefully perform these checks before starting operation and perform warm-up operation.
Carefully check the various parts of the machine.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......