
411
8. INSPECTION AND MAINTENANCE
CAUTION
In this section, only the equipment with the searcher hook specification, different from the
standard specification is described.
See “Inspection and maintenance” for details on the machine not described in this section.
8.1 PRE-OPERATION INSPECTION
Check the following before starting work after mounting a searcher hook every day.
[1] Inspection of searcher hook boom and bracket
Check for any cracks, significant deformation or dirt in searcher hook boom and bracket.
Also, check for loose, missing or damaged check pins. Repair or replace if any abnormality is found.
[2] Inspection of swivel hook
Check that there is no deformation of the swivel hook (2) or noise
coming from bearings and the hook latch (S) functions correctly.
Also, check the shackle (3) attaching the swivel hook (2).
[3] Inspection of moment limiter (searcher hook mode)
CAUTION
In this section, only the equipment with the searcher hook specification, different from the
standard specification is described.
See “Inspection and maintenance” for details on the machine not described in this section.
Check that the monitor indicates the searcher hook mode and
“OFFSET POSITION” can be changed freely.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......