2.17 CRANE OPERATION POSTURE
To proceed to the crane operation from the state mentioned in “OPERATION 2.16 OPERATION
BEFORE CRANE WORK”, bring the crane into a state ready for operation by following the steps
mentioned below.
1. Push the right control lever (1) forward to unwind the
wire rope to an extent that the hook block does not
come into contact with the ground.
NOTES
If the hook block is secured to the hook stowage wire,
remove the hook block from the stowage wire.
2. Push the right control lever (1) to the left to raise the
boom to a position where the hook block is not
over-wound and makes no contact with the ground.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......