
170
1. Shift the lock lever (1) into the free (F) position.
2. See “OPERATION 2.2 STARTING ENGINE” to start the
engine.
3. Take your foot off the accelerator pedal (6) to allow the
engine to run at idle.
4. Change the mode to Outrigger mode with the mode
selector switch (1) (Travel/Outrigger/Crane) on the
monitor or the left control lever.
5. Make sure that the crane stowage lamp (1) on the
monitor is lit in yellow.
6. Select the Manual mode with the mode selector switch
(3) (Manual/Auto) on the monitor or the left control
lever.
When operating two outrigger switches at the same time, only two on the front side
(outriggers [(1)] and [(4)]) or two on the rear side (outriggers [(2)] and [(3)]) can be
operated at the same time. If two switches on either left or right side are operated at the
same time, two outriggers on one side may be abruptly activated, causing the machine
to overturn.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......