
285
9.1.5 INSPECTION OF ENGINE START AND STOP OPERATION (RADIO
CONTROL)
Ensure that the boom and outriggers are all stowed in the correct positions.
If they are not in the correct positions, use the applicable levers on the machine side to
stow them correctly.
Otherwise, the transmitter operation may cause damage to the Crane or tipping that
results in serious injury.
[1] INSPECTION OF ENGINE START OPERATION
1. Turn “ON” the main starter switch on the machine
side.
2. Press the “start/stop radio control button” (3) of the
transmitter twice to turn the power “ON”.
3. Press the horn switch (7) and check that the horn
sounds.
4. Push down the “Engine start/stop switch (4)” to the
start side and check that the engine starts.
[2] INSPECTION OF ENGINE STOP OPERATION
1. After the engine has started as above [1], push
down the Engine start/stop switch (4) and check
that the engine stops.
2.
After the engine has started as above [1], push the
Emergency stop switch (11) and check that the
engine stops.
Left side
Right side
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......