9.1.4 INSPECTION AFTER STARTING ENGINE
Check the following in this section after starting the engine and before starting the work every
day.
CAUTION
The checkups described in this section should be carried out after starting the machine.
See “OPERATION 2.2 STARTING ENGINE” and later to execute the engine start up,
traveling operations, outrigger operations and crane operations.
[1] INSPECTION OF OUTRIGGER SAFETY EQUIPMENT OPERATION
[Checking operation of crane interlock]
1. Turn “ON” the starter switch.
2. Press the mode switch (1) of the monitor or touch
the screen to enter the “outrigger mode”.
3. Check that only the crane stowage position lamp
(1) of the monitor is eventually lit in green.
4. Insert the position pins (4) securely by rotating
outward the outrigger rotary of all four outriggers.
Check that all the extension lamps (2) of the
monitor are lit.
NOTES
After operating the outrigger rotary extension, make sure
that the position pins (4) are correctly inserted and
secured.
Summary of Contents for MC815C
Page 2: ......
Page 30: ...20 This Page Intentionally Left Blank...
Page 73: ...63 3 Total load chart 106 2186300...
Page 75: ...65 9 Precautions when using 106 2186600...
Page 76: ...66...
Page 82: ...72 This Page Intentionally Left Blank...
Page 197: ...187 Remote control menu...
Page 254: ...244 This Page Intentionally Left Blank...
Page 314: ...304...
Page 338: ...328 This Page Intentionally Left Blank...
Page 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Page 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Page 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Page 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 398: ...388 This Page Intentionally Left Blank...
Page 402: ...392 1 Searcher hook working range diagram 106 2189200...
Page 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Page 426: ......