Preparing for Router Installation
Figure 26: Typical Center-Mount Rack
Mounting rails
Floor bolts
1011
(2.13 m)
7 ft
19 in. (48.3 cm)
Spacing of Mounting Holes
Table 14 specifies the spacing between mounting holes in the chassis’s front support
posts and center-mounting brackets. The mounting holes in a front-mount rack’s
rails must align with the holes in the front support posts, and the mounting holes in a
center-mount rack’s rails must align with the holes in the center-mounting brackets.
Table 14: Spacing of Holes on Front Support Post and Center-Mounting Bracket
Router Mounting Rail
Hole Spacing
Front support post
4 U (7 in. or 17.78 cm)
Center-mounting bracket
3 U (5.25 in. or 13.33 cm)
Rack Requirements
61
Summary of Contents for Internet Router M160
Page 12: ...M160 Internet Router Hardware Guide xii Table of Contents ...
Page 16: ...M160 Internet Router Hardware Guide xvi List of Figures ...
Page 18: ...M160 Internet Router Hardware Guide xviii List of Tables ...
Page 24: ...M160 Internet Router Hardware Guide xxiv Requesting Support ...
Page 26: ...2 Product Overview ...
Page 30: ...M160 Internet Router Hardware Guide 6 Safety Requirements Warnings and Guidelines ...
Page 66: ...M160 Internet Router Hardware Guide 42 Cable Management System ...
Page 80: ...M160 Internet Router Hardware Guide 56 Routing Engine Architecture ...
Page 82: ...58 Initial Installation ...
Page 104: ...M160 Internet Router Hardware Guide 80 Unpacking the Router ...
Page 148: ...M160 Internet Router Hardware Guide 124 Configuring the JUNOS Internet Software ...
Page 150: ...126 Hardware Maintenance Replacement and Troubleshooting Procedures ...
Page 242: ...M160 Internet Router Hardware Guide 218 Troubleshooting the Power System ...
Page 244: ...220 Appendixes ...
Page 292: ...M160 Internet Router Hardware Guide 268 Packing Components for Shipment ...
Page 301: ...Part 5 Index Index 277 ...
Page 302: ...278 Index ...