186 - Inepro Back Office Suite
Configuration
IP-address
The IP-address needs to be in the IP-range for example if the server address is 192.168.0.1 the Terminals IP-address
should start be 192.168.0.x where 'x' is a number between 1 and 254 (or rather between 10 and 255 because the first 9
numbers (1-10) often are often dedicated to other important network devices). Although each part of the IP-address has a
range of 0-255, the numbers 0 and 255 have a special meaning and can never be used.
The subnet address is used for sub-netting (a way to divide the network into smaller networks), but in most cases sub
netting isn't used and the value can be left to the default value '255.255.255.255'.
A gateway is a network point that acts as an entrance to another network and is often also the proxy-server and router for
the network, usually it's the first IP-address in the range. So if for example the range is 192.168.0.x then the gateway's IP-
address would be 192.168.0.1 or if the range is 10.0.0.x the gateway's IP-address would be 10.0.0.1.
The easiest way to make sure the IP-address is pointing to the correct server: go to the Start menu on the server running
the PayCon Server service and choose 'Run' then type 'cmd' to go to the command prompt and type 'ipconfig' and press
enter.
The IP-addresses of the default gateway and the subnet are shown in console screen.
Summary of Contents for Back Office Suite
Page 2: ......
Page 9: ...Introduction PartI ...
Page 11: ...3 Overview IBOS Overview IBOS ...
Page 12: ......
Page 13: ...Hardware Installation PartII ...
Page 20: ......
Page 21: ...Software installation PartIII ...
Page 38: ......
Page 39: ...Steps PartIV ...
Page 120: ...112 Inepro Back Office Suite Steps Image 1 Image 2 Image 3 ...
Page 149: ...Advanced Tasks PartV ...
Page 153: ...145 Replacing a server PayCon Server ...
Page 157: ...Terms Concepts PartVI ...
Page 159: ...Configuration PartVII ...
Page 177: ...169 Import Data If the installation was successful the final screen of the installer is shown ...
Page 179: ...171 Import Data The following screen will appear ...
Page 206: ......
Page 207: ...Change Interface Settings PartVIII ...
Page 209: ...USB Stick Procedure PartIX ...
Page 211: ...Balance Scheduler PartX ...
Page 214: ......
Page 215: ...Scheduled Tasks PartXI ...
Page 218: ......
Page 219: ...Troubleshooting PartXII ...
Page 234: ......
Page 235: ...Glossery PartXIII ...
Page 238: ......
Page 239: ...Appendices PartXIV ...
Page 244: ...236 Inepro Back Office Suite Appendices ...
Page 246: ......
Page 248: ......