94 - Inepro Back Office Suite
Steps
For example to enter zone 'K' door 1 must be
opened on the A side, zone 'A' must be entered
and then door 15 on the 'A' side must be opened.
Additionally doors 1a and 15a must be opened to
get in, 15b and 1b to get out.
Of course another path can be taken; open door
20 on the 'A' side, enter zone 'B', open door 21 on
the 'B' side, enter zone 'A', open door 7 on the 'A'
side, enter zone 'I', open door 9 on the 'A' side and
finally enter zone 'K' but that would be taking a
very inefficient route.
Doors on the outside of a building and the zones
connected to these doors are entered as 'root
nodes' in the tree structure in Inepro Back Office.
Zones that are accessible exclusively by another
zone have that zone as a parent in the tree
structure.
Summary of Contents for Back Office Suite
Page 2: ......
Page 9: ...Introduction PartI ...
Page 11: ...3 Overview IBOS Overview IBOS ...
Page 12: ......
Page 13: ...Hardware Installation PartII ...
Page 20: ......
Page 21: ...Software installation PartIII ...
Page 38: ......
Page 39: ...Steps PartIV ...
Page 120: ...112 Inepro Back Office Suite Steps Image 1 Image 2 Image 3 ...
Page 149: ...Advanced Tasks PartV ...
Page 153: ...145 Replacing a server PayCon Server ...
Page 157: ...Terms Concepts PartVI ...
Page 159: ...Configuration PartVII ...
Page 177: ...169 Import Data If the installation was successful the final screen of the installer is shown ...
Page 179: ...171 Import Data The following screen will appear ...
Page 206: ......
Page 207: ...Change Interface Settings PartVIII ...
Page 209: ...USB Stick Procedure PartIX ...
Page 211: ...Balance Scheduler PartX ...
Page 214: ......
Page 215: ...Scheduled Tasks PartXI ...
Page 218: ......
Page 219: ...Troubleshooting PartXII ...
Page 234: ......
Page 235: ...Glossery PartXIII ...
Page 238: ......
Page 239: ...Appendices PartXIV ...
Page 244: ...236 Inepro Back Office Suite Appendices ...
Page 246: ......
Page 248: ......