FusionModule800 Smart Small Data Center
Maintenance Guide
5 Parts Replacement
Issue 02 (2016-11-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
63
Figure 5-28
Removing a fan
Step 8
Install the new fan in the original position by performing the preceding steps in reverse order,
and insert the fan terminal.
Step 9
Clear up the indoor fan total runtime.
Method 1: Log in to the ECC800 mobile phone or pad app as admin.
a.
Choose
Home
.
b.
Tap the cabinet that houses the air conditioner in the micro-module view.
c.
Tap the air conditioner to be set in the cabinet layout diagram.
d.
Choose
Real-time Data
>
Perf Maint
, clear up the indoor fan total runtime.
Method 2: Log in to the ECC800 WebUI as admin. Choose
Monitoring
>
Air
Conditioner
>
NetCol5000-A0104
>
Controls
>
Performance Maint Ctrl
, clear up the
indoor fan total runtime.
----End
5.3.1.3 Replacing a Condensate Pump
Prerequisites
Tool: Phillips screwdriver.
A condensate pump needs to be replaced.
A spare condensate pump of the same model is available and functional.
Context
The condensate pump is maintained from the rear.
Procedure
Step 1
Shut down the air conditioner over the EMS.
Method 1: Log in to the ECC800 mobile phone or pad app as admin.
a.
Choose
Home
.