12 Decommissioning, Storage and Transport
12.1 De-commissioning
De-commissioning is necessary, for example, under the following circumstances:
■ The machine is temporarily not needed
■ The machine will not be needed for a considerable time.
■ The machine is to be scrapped.
Precondition The machine is shut down.
Machine dry and cool.
1. Carry out the following de-commissioning procedures.
2. Place a notice on the instrument panel describing the de-commissioning procedures carried
out.
12.1.1 Temporary de-commissioning
Decommissioning for about 4 months.
Material Plastic sheeting
Moisture-resistant adhesive tape
1. Disconnect the battery (the minus terminal first and then the plus terminal).
2. Close off the following openings with plastic foil and moisture-resistant adhesive tape.
■ Engine air inlet
■ Compressor air inlet
■ Exhaust silencer
3. Attach the following notice on the instrument panel showing the decommissioning measures
taken.
Attention!
1. The machine is temporarily decommissioned.
2. The following machine openings have been covered:
■ Engine air inlet
■ Compressor air inlet
■ Exhaust silencer
3. Recommission according to service manual.
Date / signature
Tab. 99 "Temporarily decommissioned" information notice