Long-term decommissioning and storage tasks
See
chapter
Complied?
➤ Hang a notice on the instrument panel informing of the decommis‐
sioning measurements taken.
–
Tab. 100 "Long-term decommissioning and storage" checklist
➤ Hang the following notice on the instrument panel informing of the decommissioning measure‐
ments taken.
Attention!
1. The machine is decommissioned.
2. It is filled with preserving oil.
3. For recommissioning:
■ Measures for recommissioning the compressor after a long period of storage.
■ Recommission according to service manual.
Date / signature
Tab. 101 Text for the "long-term decommissioned and storage" information notice
➤ Store in a dry place with even temperature.
12.2 Transportation
Depending on the options fitted, the following possibilities are available for moving the machine lo‐
cally or transporting it as a load:
■ Transport by crane.
─ Transport by crane is allowed for all machines with crane lifting eye.
■ Transporting the machine as load.
Instructions for transporting the machine as a trailer on public roads can be found in the oper‐
ating manual for the chassis.
Precondition The machine is shut down.
The machine is locked off against unintentional activation.
The machine is fully vented, the pressure gauge reads 0 bar!
The machine has cooled down.
All compressed air consumers are disconnected.
All connecting lines have been disconnected and removed.
Any loose or movable parts that could fall off during transportation have been removed or secured.
➤ Follow all instructions carefully.
12 Decommissioning, Storage and Transport
12.2 Transportation
No.: 9_9548 22 HCE
Operating Manual Portable Rotary Screw Compressor
MOBILAIR M27 PE