Assembly:
Task
Daily
A250
A500
A1000
A1500
A2000
A3000
A36000
See Chapter
Note
Have the safety valve(s)
checked.
X
KS, FW
Enclosure:
Check sound insulation material.
X
Maintain the rubber sealing
strips.
X
Check function of closed enclo‐
sure.
X
Check the connection elements.
X
Bodywork:
Have crane suspension
checked.
X
KS, FW
Hose lines (pressure hoses, fuel hoses):
Check all hose lines of the ma‐
chine for proper seating, leaks
and wear; have them replaced if
necessary.
X
KS, FW
Arrange for the engine fuel ho‐
ses to be replaced.
X
KS, FW
Arrange for the engine pressure
hoses to be replaced.
X
KS, FW
Arrange for the compressor
pressure hoses to be replaced.
X
KS, FW
Other maintenance tasks:
Check all accessible screw fit‐
tings, lines and clamps for wear
and tightness.
X
KS, FW
Check all electrical connections
for tightness.
X
Check the lighting system's
function.
X
KS ≙ Contact KAESER SERVICE,
FW ≙ Contact specialised workshop.
Tab. 91 Regular machine maintenance tasks
10 Maintenance
10.2 Following the maintenance plans
98
Operating Manual Portable Rotary Screw Compressor
MOBILAIR M27 PE
No.: 9_9548 22 HCE