5 Commissioning the system – Procedure
68
HDG Compact 99 - 200 - Version 1 - en
©
HDG Bavaria GmbH 07/2008
F
ILLING
THE
FUEL
BUNKER
1.
Before filling the fuel bunker, check the rotational direction, the
intermediate base, the leaf springs and the dosing plate of the de-
livery system.
2.
Fill the fuel bunker.
✎
See the chapter entitled “6 Using the heating system”, section
“6.12 Filling the fuel bunker”.
✓
The fuel bunker is filled.
A
DAPTING
PARAMETERS
The parameters of the HDG Control unit are programmed with the
predefined factory settings upon delivery. The predefined values of
the factory settings are intended for operation with wood chips.
In practice, operators usually have their own heating system require-
ments. Differences result from, for example, the sit-specific require-
ments or the heating fuel. If the heating system is operated with
wood pellets or chips, the relevant parameters must be changed.
In all cases, it is necessary to check the predefined parameters and, if
necessary, change them accordingly before commissioning the
system.
The fuel bunker may only be filled once the actuators have been
tested.
Warning!
Damage to delivery system during filling
If the heating system is not switched on during filling of the fuel
bunker, the overload protection of the delivery system could be
triggered when the heating system is switched on after the filling.
When filling the fuel bunker for the first time, activate the delivery
system by switching in manual operation.
Danger!
Material damage and injury due to incorrect settings!
Adjusting these parameters requires comprehensive specialist
knowledge. If the parameters are adjusted by an untrained person,
the heating system can be damaged.
Only allow authorised specialists to make adjustments to the para-
meters.