
4 Planning and installation – Installing the heating system
53
7. Push both ash accumulation bins (4) onto the door necks of the
ash removal doors (1).
8. Use the spacers (2) during installation of the ash accumulation
bins (4).
9. Install the ash accumulation bins (4) on the ash removal doors (1)
with the M12 screws and nuts (spanner size SW19) and washers.
10.If necessary, compensate for any unevenness on the floor with the
aid of the adjustable legs (3) on the ash accumulation bins (4).
11.Tighten all the screws on the central ash removal system.
12.Insert the feather key (2) into the ash removal auger.
Figure 4/23 - Installing the ash accumulation bins
2
4
1
3
Figure 4/24 - Installing the motor and ash bin
2
6
5
1
3
4