4 Planning and installation – Installing the heating system
46
4.4 Installing the heating system
R
EQUIREMENTS
The heating system will initially be commissioned by specialists from
HDG Bavaria or from an authorised HDG partner and a qualified elec-
trician.
Danger!
Risk of material damage and injury due to incorrect installation
Installing the system requires comprehensive specialist knowledge.
If installed by untrained persons, the heating system can be da-
maged and persons may be injured due to secondary damage.
Only allow authorised specialists to perform the installation.
Danger!
Dangerous electrical current or voltage
Working on live components can result in an electric shock.
Switch off the mains supply to the heating system during the instal-
lation.
Important!
When laying the pipelines, observe the minimum required clea-
rances.
✎
See section “4.1 Planning the heating system” in this chapter.
Important!
Due to the noise, we recommend acoustic insulation measures for
components which are in contact with the floor, wall or ceiling of
the heating room.
The following figures and diagrams show the version of the heating
system HDG Compact 99 - 200 with the feeding system TBZ 150 on
the left side of the boiler.
Please keep this in mind if your version has a feeding system on the
right.